WindEurope’s response to ENTSO-E stakeholder consultation on “Connection Network Codes_revised Implementation Guidance Documents_November 2020 | WindEurope
days
hours
mins
secs
Watch the latest Giles & Pierre video

Position papers

WindEurope’s response to ENTSO-E stakeholder consultation on “Connection Network Codes_revised Implementation Guidance Documents_November 2020

This report presents WindEurope’s response to ENTSO-E stakeholder consultation on “Connection Network Codes_revised Implementation Guidance Documents_November 2020”. The revised Implementation Guidance (IGD) documents cover important aspects for the national implementation of Network Codes such as parameters of non-exhaustive requirements, frequency ranges and compliance verification including compliance testing and use of equipment certificates.

Read the position paper

dogear