WindEurope feedback to ENTSO-E workstream proposal for the development of multi-vendor HVDC systems and other Power Electronics Interfaced Devices | WindEurope
Watch Giles & Pierre Ep. 24

Position papers

WindEurope feedback to ENTSO-E workstream proposal for the development of multi-vendor HVDC systems and other Power Electronics Interfaced Devices

This document sets out WindEurope’s response to ENTSO-E’s proposal for a workstream on the development of multi-vendor HVDC systems and other Power Electronics Interfaced Devices.

Read the position paper

dogear