8 September 2024
WindEurope response to ACER public consultation on proposal for amendments to the Network Code on High Voltage Direct Current (NC HVDC)
This document presents WindEurope’s response to the public stakeholder consultation by ACER in the process of amendments to the grid connection requirements for high voltage direct current systems and related power park modules (NC HVDC).
WindEurope proposes explanatory comments, legal text modifications and articles on topics including but not limited to grid forming, the introduction of two new neutral terms in the NC HVDC: “isolated AC network” and “isolated AC network operator”, the consistency with the NC RfG, the integration of cyber-protected data exchange interface where relevant.