Overview

This report presents WindEurope's response to ENTSO-E stakeholder consultation on “Connection Network Codes revised Implementation Guidance Documents November 2020”. The revised Implementation Guidance (IGD) documents cover important aspects for the national implementation of Network Codes such as parameters of non-exhaustive requirements, frequency ranges and compliance verification including compliance testing and use of equipment certificates.