Published on 08 September 2024
Overview
This document presents WindEurope's response to the public stakeholder consultation by ACER in the process of amendments to the grid connection requirements for high voltage direct current systems and related power park modules (NC HVDC).
WindEurope proposes explanatory comments, legal text modifications and articles on topics including but not limited to grid forming, the introduction of two new neutral terms in the NC HVDC: “isolated AC network” and “isolated AC network operator”, the consistency with the NC RfG, the integration of cyber-protected data exchange interface where relevant.
WindEurope proposes explanatory comments, legal text modifications and articles on topics including but not limited to grid forming, the introduction of two new neutral terms in the NC HVDC: “isolated AC network” and “isolated AC network operator”, the consistency with the NC RfG, the integration of cyber-protected data exchange interface where relevant.