Please sign in to receive proper access rights.
-
{{ windFarm.name }} {{windFarm.localArea }}{{ owner }} {{ developer }} {{ windFarm.turbineManufacturer }} {{ windFarm.status }}{{ windFarm.seaBasin }}
No wind farms have been found for the criteria you specified.
—
/ {{ filteredFarms.count }}
{{ windFarm?.name }}
{{ windFarm.secondName }}
Demo
{{ windFarm?.name }}
{{ windFarm.secondName }}
Demo
Located at
{{ windFarm?.localArea }},
{{ windFarm?.seaBasin }}
,
{{ windFarm?.countryName }}
{{ Math.trunc(Math.abs(windFarm.latitude)) }}°{{ Math.trunc(Math.abs(windFarm.latitude) * 60 % 60) }}′{{ Math.trunc(Math.abs(windFarm.latitude) * 3600 % 60) }}″{{ Math.sign(windFarm.latitude) === -1 ? 'S' : 'N'}} -
{{ Math.trunc(Math.abs(windFarm.longitude)) }}°{{ Math.trunc(Math.abs(windFarm.longitude) * 60 % 60) }}′{{ Math.trunc(Math.abs(windFarm.longitude) * 3600 % 60) }}″{{ Math.sign(windFarm.longitude) === -1 ? 'E' : 'W' }}
, {{ windFarm?.anchorage?.toLowerCase() }}
, altitude: {{windFarm?.altitudeDepthM}} m
, {{ windFarm?.shoreDistanceKm }} km from shore
Owned by
{{ owner }}
operated by {{ windFarm.operator }}
developed by
/
{{ windFarm?.status?.toLowerCase() }}
{{ windFarm?.auctionType }} awarded in
Awarded in
{{ windFarm?.awardedYear}}
{{ (['Online', 'Dismantled'].includes(windFarm.status) && ', commissioned') || ', commissioning' }} in
{{ (['Online', 'Dismantled'].includes(windFarm.status) && 'Commissioned') || 'Commissioning' }} in
{{ windFarm?.commissioningYear }}
{{ ((windFarm.status === 'Dismantled') && ', decommissioned') || ', decommissioned' }} in
{{ ((windFarm.status === 'Dismantled') && 'Decommissioned') || 'decommissioned' }} in
{{ windFarm?.decommissionedYear }}
{{ windFarm?.numTurbines}}
{{ windFarm?.turbineModel }}
turbine
turbines
by
{{ windFarm?.turbineManufacturer }}
, power rated
, tip height {{ windFarm?.tipHeightM }} m
{{ windFarm.totalFoundationsInstalled }} {{ windFarm.totalFoundationsInstalled === 1 ? 'foundation' : 'foundations' }}
,
{{ windFarm.totalTurbinesInstalled }} {{ windFarm.totalTurbinesInstalled === 1 ? 'turbine' : 'turbines' }}
installed
{{ windFarm.totalTurbinesConnected }} turbines
,
{{ format('.1~%')(windFarm.totalCapacityConnectedMw / windFarm.totalCapacity * 1e6) }} of total capacity
connected
{{ windFarm?.anchorageNature }}
{{ windFarm.foundationType.toLowerCase() }}
, provided by {{ windFarm.foundationSupplier }}
, {{ windFarm.altitudeDepthM }} m deep
Network laid out as {{ windFarm?.networkTopology }}
{{ windFarm?.exportCableVoltageKv }} kV export cables
Export cables
supplied by {{ windFarm.exportCableSupplier }}
{{ windFarm?.interArrayVoltageKv }} kV inter-array cables
Inter-array cables
supplied by {{ windFarm.interArraySupplier }}
{{ windFarm?.marineContractors }} as marine contractors
{{ windFarm?.manufacturingPorts.join(', ') }}
as manufacturing {{ windFarm?.manufacturingPorts.length === 1 ? 'port' : 'ports' }}
;
{{ windFarm?.oAndMPorts.join(', ') }}
as O&M {{ windFarm?.oAndMPorts.length === 1 ? 'port' : 'ports' }}
;
{{ windFarm?.installationPorts.join(', ') }}
as installation {{ windFarm?.installationPorts.length === 1 ? 'port' : 'ports' }}
€{{ windFarm?.capexEurBn }} bn
,
Final Invested Decision expected in {{ windFarm?.expectedInvestmentDecisionDate }}
,
Final Invested Decision taken in {{ windFarm?.finalInvestmentDecisionDate }}
Wind farm density {{ windFarm.anchorage.toLowerCase() }}
You don't have the necessary rights to access the wind farms tool. Please contact the membership team to upgrade.