Share this page on:

Home | Programme overview | All oral presenters | Poster presentations | Press coverage | Event videos | Event photos

Back

 
  -
 

 


An assessment of the impact of pre-construction energy yield analysis on post-construction budgets

Selena Farris
Natural Power, United Kingdom
AN ASSESSMENT OF THE IMPACT OF PRE-CONSTRUCTION ENERGY YIELD ANALYSIS ON POST-CONSTRUCTION BUDGETS
Abstract ID: 196  Poster code: PO.222 | Download poster: PDF file (0.38 MB) | Full paper not available

Presenter's biography

Biographies are supplied directly by presenters at WindEurope 2016 and are published here unedited

Selena currently heads the methods and innovations division within the Wind Technical Team. Selena has been in the industry for eight years working for Consultants, Developers and Utilities. Her primary experience has been in the North American wind market. She has experience with every stage of development, from site selection, met campaign design, layout design, energy yield assessments, to turbine performance, post construction reconciliations, and energy forecasting.

Abstract

An assessment of the impact of pre-construction energy yield analysis on post-construction budgets

Introduction

Natural Power considers the implications of pre-construction analyses on the budget for post-construction performance.

Approach

Following a validation of the pre-construction methodologies, the budget numbers are compared with operational yields to determine underperformance.

Main body of abstract

Perceived turbine underperformance based on pre-construction energy yield analysis has been a common theme across the industry. To rectify this, Natural Power has conducted a pre-construction methodology validation to determine the limitations of the pre-construction methodology and to incorporate these findings into producing a high quality energy yield product. Looking forward, Natural Power examines how wind farm energy budgets derived from pre-construction energy estimates, can allow for a better understanding and assessment of wind farm and individual turbine performance.

Conclusion

The results of the analysis show the importance of accurate pre-construction energy yield analysis and the implications on expectations for the operational wind farm.


Learning objectives
The importance of accurate pre-construction energy yield analysis for operational budgets.
The impact of availability on budgeted performance.