Pintxos with R&D projects – INTEGRIA / WILLOW / MEGAWIND
When: 20–21 March at 17:00-18:00 and 22 March at 13:00–14:00
Where: Basque Energy Cluster stand, 1-B60
Open to: All registered participants
Join us for some Basque food (pintxos), Basque cider and a special presentation of different Basque R&D discoveries in the Wind Energy sector each day!
See below the R&D projects to be presented:
- Wednesday 20 March: Nautilus Floating Solutions will present the R&D project INTEGRIA.
INTEGRIA project will generate a single comprehensive model consisting of several digital models based on Artificial Intelligence to improve the design of elements of the structure (transition piece, TP), the mooring system, the evacuation and power supply components, the corrosion and biofouling protection systems or the hydraulic and mechanical systems for the control of the floating wind turbine. - Thursday 21 March: CEIT will present the R&D project WILLOW.
WILLOW integrated system will provide an open-source, data-driven smart curtailment solution to the Wind Farm Operators with the basis of an integrated Wind Farm Control system looking for a trade-off between the power production and the lifetime consumption. - Friday 22 March: Erreka Fastening Solutions will present the R&D project MEGAWIND.
MEGAWIND aims to develop new solutions for monopiles which will be integrated with the new generation of large offshore wind turbines (+15 MW). The project will focus on the innovation
Come and discover latest news from these projects and enjoy Basque food and drinks!